MT PASA WA SWIS Reliability Assessment

Model Structure

Interactive network visualizations of the SCED optimization model. Drag nodes to rearrange, hover for details, scroll to zoom.

Fleet Composition

Generator and battery fleet grouped by technology category. Node size reflects installed capacity.

Constraint Network

Network constraints link facilities whose combined output is limited. Constraint nodes (diamonds) show the limit; facility nodes (circles) are sized by capacity.

Reserve Participation Network

Reserve classes connected to facilities that can provide them. Edge thickness shows maximum response capacity.

Merit Order

Generation stack ordered by variable operating cost. Lower cost generators dispatch first.

Facility Properties